NOW THAT’S SQUARE BUSINESS
CDBG-Eligible Residential Rehabilitation

Residential Rehabilitation

CDBG-eligible residential rehabilitation, reconstruction, accessibility modifications, and energy-efficiency upgrades — delivered with the documentation HUD, GLO, and CDBG-DR monitors expect. Pre-1978 homes are run under full lead-based paint compliance.

Scope

The four CDBG-eligible scopes our residential rehabilitation crews mobilize against — each delivered to program standards with the certified payroll, environmental, and lead-clearance paperwork already in place.

Rehabilitation

Whole-home modernization that brings substandard housing up to program and code standards without changing the structure’s footprint.

Typical scopes

  • Whole-home modernization & rehabilitation
  • Kitchen and bath rehabs to code
  • Weatherization & air-sealing
  • Roof and siding rebuild
  • Structural sistering and framing repair
  • Plumbing and electrical upgrades to current code

Reconstruction

Tear-down and rebuild for structures the program has determined to be unrehabilitable — matching or smaller footprint, code-compliant replacement unit.

Typical scopes

  • Demolition and debris coordination
  • Replacement-unit construction to program standards
  • On-site or modular delivery as the program requires
  • Foundation, utility connections, and code-compliant finishes
  • Site restoration and closeout documentation

Accessibility Modifications

Unit modifications that make a home livable for a household member with a disability — tied to Section 504 accessibility requirements where the program applies.

Typical scopes

  • Ramp and landing installation
  • Doorway widening for wheelchair access
  • Accessible bathing (roll-in shower, transfer bench reinforcement)
  • Grab-bar reinforcement at key locations
  • Kitchen reach-range modifications and lever hardware
  • Reasonable-accommodation process coordination with the program

Energy Efficiency Upgrades

Envelope, HVAC, and lighting upgrades that reduce utility burden on program-eligible households — pulled to ENERGY STAR and program baselines rather than minimum code.

Typical scopes

  • Insulation upgrades (wall cavity and attic)
  • Window and door replacement to ENERGY STAR
  • HVAC right-sizing and sealed ductwork
  • LED lighting retrofits
  • Weather-stripping and air-sealing at envelope penetrations
HUD Compliance Posture

Federal program alignment

Residential rehabilitation under federal funding brings a specific regulatory anchor set. The list below frames how each anchor is met on our scopes — every engagement runs against the same compliance baseline.

  • 24 CFR Part 570 — Community Development Block Grant program framework. CDBG-eligible activities under §570.201(b)–(c) cover rehab, reconstruction, public facilities, and direct assistance to program-eligible households.
  • Section 504 accessibility — Units modified for accessibility conform to 24 CFR Part 8 where applicable to the program. Tenant-side reasonable-accommodation requests are processed through the program’s established procedure.
  • Davis-Bacon prevailing wage — Applies where the underlying contract triggers (construction of 8+ units, rehabilitation of 8+ units under CDBG / CDBG-DR). Posted wage decisions, WH-347 certified payroll, and on-site interview records maintained for every covered project.
  • Environmental Review (24 CFR Part 58) — Projects run through the responsible entity’s environmental review (ERR) record prior to commitment of funds. Site-specific constraints (historic properties, floodplain, coastal barrier resources) cleared through the program before construction starts.
  • Lead-Based Paint (24 CFR Part 35) — Applies to pre-1978 housing receiving federal rehab assistance. Pre-1960 housing presumed lead-bearing unless testing clears the structure. Occupant protection during work, EPA RRP-certified crews, and clearance testing on completion.
[Placeholder] Past-performance references (program, scope, contract value, agency, contact) will be added here only when Arthuro confirms the real numbers. Do not invent past performance, contract values, or named primes.
Working With Us

From first call to punch list

Every federal residential engagement runs through the same six-step arc — intake and eligibility, site assessment, written scope, contract and notice to proceed, construction with documentation, and monitor-ready closeout.

  1. Intake & eligibility. Project intake against the program’s eligible-activity and beneficiary criteria; we confirm Davis-Bacon coverage, Section 504 obligations, and lead-based paint applicability up front.
  2. Site assessment. Walk-through with the program’s inspector or our scope lead; photo log; measured scope of work; flag any environmental or lead-paint clearance items before we commit pricing.
  3. Written scope & proposal. Unit-itemized proposal with labor, material, and allowance lines — no hidden scope, no bundled numbers that monitors have to unwind later.
  4. Contract & notice to proceed. Fully executed subcontract, wage decisions posted to the job site, WH-347 process in flight before the first crew truck rolls.
  5. Construction. Daily field reports with GPS-tagged photo log, certified payroll on the program’s cadence, change orders in writing before work moves past the original scope.
  6. Closeout. Monitor-ready package: final certified payroll, change-order log, environmental and lead-paint clearance documentation, as-built photo set, and warranty letter.

What we deliver

  • Davis-Bacon wage decisions on file and posted at the job site
  • Certified payroll (WH-347) on the program’s reporting cadence
  • Section 3 labor-hour reporting where the program requires it
  • EPA RRP lead-based paint documentation for pre-1978 housing
  • Environmental review support (24 CFR Part 58) before any site work
  • Daily field reports and photo log for monitor review
Start a residential rehab scope See pricing tiers
Federal Credentials
CAGE
96JK1
UEI
URMWDG7X2GM4
NAICS
236118 · 236220 · 624230
Section 3
Registered Business Profile
Ready When You Are

Have a scope, a site, or a community to rebuild?

Federal primes, homeowners, and disaster-recovery program managers — one inbox, one team, one phone number. We respond within one business day.

Start a Project Email info@apexbuildos.com